CHENGHAI / SHANTOU / CHINA·Tell us what you need · We source it through Chenghai

Quality control

Quality is built around the approved specification

The exact plan depends on product risk, buyer requirements and the order. The common principle is to place clear checkpoints before shipment.

IncomingIn-linePre-shipment
Toy assembly line in Chenghai with water toys on the conveyor
Chenghai assembly line with yellow water toys on the conveyor
In-line assembly
Open electric toy on the bench showing pump, tank and wiring
Function check before closing the shell

Three quality layers around the order

Quality checks follow the approved specification from incoming materials through final shipment.

Quality control checkpoints

Quality control checkpoints

Keep factory records, sample approval and carton release on one file.

01

Incoming

Materials and parts

Plastic, motors, batteries, printing and packaging are checked before they enter production.

IQC record
02

In-line

Assembly and function

First article, screw torque, lights, spray, remote function and accessories are compared with the approved sample.

IPQC / first-article
03

Pre-shipment

Quantity and cartons

Appearance, function, labels, barcodes, case count and outer marks are reviewed before the truck leaves.

OQC / AQL as agreed

Common inspection areas

AreaWhat we look at
AppearanceColor, surface, decoration, seams and visible defects
DimensionsProduct size, fit, carton size and pack quantity
FunctionMovement, water spray, bubble output, lights, sound or remote control
SafetySharp edges, small parts, battery compartment, fasteners and warnings
PackingAccessories, instructions, barcode, case count and carton marks
Chenghai production line with workers assembling plastic toys
Production continues only against the approved sample and change list.

Next step

Send the buying brief

WhatsApp